Xinjiang Eneng Wind Power Project

SOURCE:adminTHE RELEASE DATA:2018-06-14 VIEWS:

新疆风电-1.jpg

新疆风电-2.jpg

This project is invested by POWERCHINA Hubei Electric Engineer corpotation, the installed capacity is 100MW, 66 wind fans have been applied in the project, there are 10.6 km’s 110KV transmit line and 39km integrated circuit of 35KV wind fans, all of the above transmit lines are contracted by our company, which also include 110KV foundation of steel tower, steel tower assemblage, and setting out; concrete electricity pole assemblage, setting out, measurement, testing, etc. Under the influence of  wind fans installation and cold winter there, the full construction period started from the end of Aug. 2015 and lasted till Sept. 2016, the part we contract to build got favourable comments both from the employers and supervisors.


TEL:027-68784906

E-mail:3168372690@qq.com

ADDRESS: 13th Floor, 7# of R&D Building, the Third Phase of Modern International Design Area, Guannan Technical Industrial Park, Donghu New Technology Development District, Wuhan 

CHINESE|ENGLISH

COPYRIGHT© HUBEI BRILLIANT ENERGY POWER ENGINEERING CO.,LTD